Smart, energy saving & with speedy ROI
A full “turnkey” project solution has been provided by Sylvania in collaboration with E.ON Germany at the industrial site of Elterlein Metal Factory, where energy efficient Sylvania Start highbays were installed together with the tailored SylSmart Connected Industry system, the combination of which resulted in remarkable energy savings of 82%. Besides the massive cost savings that secured 2years 3 months project payback, working conditions and safety have also been significantly improved.
The Project Client: Elterlein Metal Factory, Germany